Passenger platforms No. 2 and No. 3 at the Central Railway Station of Tbilisi and its infrastructure have been reconstructed. The renovation work cost 7.4 million lari (about $2.8 million). The project includes reconstruction of platforms, navigation signs, installation of a new water supply system, and the construction of four new escalators — two on each platform. Passenger platforms now have modern climate-controlled waiting rooms for passengers, staffed during the day. The station staff must ensure the safety of passengers during the summer, when the temperature can exceed 30°C. The company aims to provide a real comfort experience as a minimum for one of the largest projects, with platform comfort exceeding 30% compared to the previous temperature. There is also an option to use escalators and elevators.